Source: https://x.com/boringcompany/status/1967359214944387546
Prufrock-4 is our smartest, fastest and safest Tunnel Boring Machine. And the next iterations (5, 6, and 7) are already being built at The Boring Factory in Texas. Goal is Continuous Mining and Zero-People-in-Tunnel (ZPIT).
You must log in or # to comment.
Removed by mod
Nice to see some videos of the TBMs in action. Since tunnelling is entirely below-ground (save for porpoising at either end), we don’t usually get to see much.
