Article text

Jeff Foust

6–7 minutes

Updated 6:10 p.m. Eastern with NASA statement.

WASHINGTON — NASA’s acting administrator says he plans to “open up the contract” SpaceX holds to land astronauts on the moon for the Artemis 3 mission because the company has fallen behind schedule.

In appearances on CNBC and Fox News on Oct. 20, NASA Acting Administrator Sean Duffy said NASA would allow other companies to compete to land astronauts on the moon for Artemis 3, a mission currently assigned to SpaceX’s Starship under a Human Landing System (HLS) contract awarded in 2021.

“SpaceX had the contract for Artemis 3,” Duffy said on CNBC. “The problem is they’re behind. They push their timelines out, and we’re in a race against China. The president and I want to get to the moon in this president’s term.”

“So, I’m going to open up the contract,” he continued. “I’m going to let other space companies compete with SpaceX, like Blue Origin, and again, whatever one can get us there first, to the moon, we’re going to take.”

Duffy made similar remarks on Fox News. “SpaceX has the contract. SpaceX is an amazing company. They do remarkable things, but they’re behind schedule,” he said. “So, I’m in the process of opening that contract up.”

“We’re going to have a space race in regard to American companies competing to see who can actually get us back to the moon first,” he said.

Duffy did not explain how such a “space race” would work or how it would be funded. Asked for further details, Bethany Stevens, NASA’s press secretary, provided only transcripts of Duffy’s television appearances. Most of NASA’s public affairs staff are currently furloughed because of the government shutdown that began Oct. 1.

She provided more details in a separate statement late in the day Oct. 20. “NASA’s Human Landing System program has given both SpaceX and Blue Origin the opportunity to present acceleration approaches by Oct. 29,” she stated. “NASA is also going to request plans from the entire commercial space industry – through an RFI – for how NASA can increase the cadence of our mission to the moon.”

The comments are the first public acknowledgment by NASA’s acting leader that development of the HLS version of Starship is behind schedule. Duffy previously maintained that Artemis 3 would launch in 2027, the agency’s official target, even as multiple Starship test flight failures earlier this year made that timeline increasingly unlikely.

In late July, Duffy told social media influencers attending the Crew-11 launch that SpaceX executives, including company president Gwynne Shotwell, assured him Starship would be ready for Artemis 3. “They feel very comfortable on Starship. They feel like they’re on pace for the lander,” he said then. “They said if there’s a holdup for Artemis 3, it’s not going to be them.”

After former NASA Administrator Jim Bridenstine told a Senate committee in September it was unlikely the United States would return humans to the moon before China’s first crewed landing, Duffy pushed back. “We are going to beat the Chinese to the moon. We are going to make sure that we do this safely. We’re going to do it fast. We’re going to do it right,” he said in an internal NASA town hall, without suggesting a change in approach for Artemis 3.

In his Oct. 20 interviews, Duffy acknowledged that Artemis 3 likely would not launch in 2027. On CNBC, after discussing Artemis 2’s planned launch as soon as next February, he said that “Artemis 3 comes a couple years after that.”

One of the competitors Duffy mentioned was Blue Origin, which has a separate HLS award to develop its Blue Moon Mark 2 lander for missions beginning with Artemis 5. The company reportedly has studied ways to adapt its smaller Blue Moon Mark 1 lander for a crewed mission, although one industry source described those concepts as “jury-rigged” and noted that Mark 1 currently cannot lift off from the lunar surface with any useful payload.

Other companies are also examining lunar lander concepts. “Throughout this year, Lockheed Martin has been performing significant technical and programmatic analysis for human lunar landers that would provide options to NASA for a safe solution to return humans to the moon as quickly as possible,” Bob Behnken, vice president of exploration and technology strategy at Lockheed Martin Space, said in a statement.

“We have been working with a cross-industry team of companies, and together we are looking forward to addressing Secretary Duffy’s request to meet our country’s lunar objectives,” he said, without providing details about the Lockheed lander concept.

SpaceX Chief Executive Elon Musk appeared unconcerned about potential competition. “They won’t,” he said in a social media post responding to a comment that it was “silly” to think another company would have a lander ready before Starship. “SpaceX is moving like lightning compared to the rest of the space industry.”

“Moreover, Starship will end up doing the whole moon mission. Mark my words,” he added.

  • burble@lemmy.dbzer0.com
    link
    fedilink
    English
    arrow-up
    2
    ·
    3 months ago

    The Blue Moon Mk2 crewed lander has most of the same technical issues to solve as Starship HLS and is planned for Artemis 5 in 2030. BM Mk1 is only supposed to land up to a 3000kg payload. It will be beyond incredible if Blue manages to land crew in the next 3 years.

  • Tsiolkovsky’all@lemmy.worldM
    link
    fedilink
    English
    arrow-up
    2
    ·
    3 months ago

    I think this is an excellent way to convince Duffy that he’s doing something impressive. My read is that he’s super stoked to be part of NASA, really wants to do something to help, but is not sufficiently qualified or well-informed to know what to do. I can totally see Amit saying “if you don’t like the schedule, the only thing we can do is ask for other options” and Sean saying “yeah totally let’s do that, I understand that”.

    The Starship mission concept makes everyone really uncomfortable, but the BO concept is an evolution of what NASA wanted to do back before HLS went commercial. I think it’s got a chance to accelerate and beat 2030 with some kind of minimum viable product.

    The recompete also pokes Elon in the eye with a sharp stick at the same time that his buddy Isaacman is angling for the administrator job. The best part is that it doesn’t actually change anything - it gives the impression of progress at very little cost.