Easy-to-use solar panels are coming, but utilities are trying to delay them

www.npr.org

external-link
message-square
210
link
fedilink
  • cross-posted to:
  • news@lemmy.world
  • energy@slrpnk.net
627
external-link

Easy-to-use solar panels are coming, but utilities are trying to delay them

www.npr.org

fuzzyfirefox@lemmy.world to Technology@lemmy.worldEnglish · 19 days ago
message-square
210
link
fedilink
  • cross-posted to:
  • news@lemmy.world
  • energy@slrpnk.net
  • artyom@piefed.social
    link
    fedilink
    English
    arrow-up
    2
    ·
    18 days ago

    According to my research, there is no such permit required in Utah. And presumably new legislation is looking to have this exception as well.

    • acosmichippo@lemmy.world
      link
      fedilink
      English
      arrow-up
      10
      ·
      edit-2
      18 days ago

      not true, you still need to apply to the utility to export to the grid.

      https://www.rockymountainpower.net/savings-energy-choices/customer-generation.html

      And presumably new legislation is looking to have this exception as well.

      why “presumably”?

      • artyom@piefed.social
        link
        fedilink
        English
        arrow-up
        1
        ·
        edit-2
        18 days ago

        Your link doesn’t mention anything about “balcony solar”. And these systems are not supposed to export to the grid anyway.

        why “presumably”?

        Because the whole point is to make solar easier and more affordable?

        • acosmichippo@lemmy.world
          link
          fedilink
          English
          arrow-up
          9
          ·
          18 days ago

          Your link doesn’t mention anything about “balcony solar”.

          “Application process for rooftop solar and other smaller systems”. If you want to export power to the grid from anything at all, you must go through this process. If you wanted to export power from a hamster on a wheel you must apply for PTO.

          Because the whole point is to make solar easier and more affordable?

          of course, but not at the cost of safety and grid reliability.

          • artyom@piefed.social
            link
            fedilink
            English
            arrow-up
            1
            ·
            edit-2
            18 days ago

            Again, “other small systems” does not mean “balcony solar”. It could just mean ground-mount systems. Everything I’ve found says it’s not required. I challenge you to find the opposite.

            Effective March 2025, systems under 1.2kW are generally exempt from traditional building permits and utility interconnection agreements with providers like Rocky Mountain Power .

            Balcony solar is pretty much “plug and play.” Depending on the state/municipality/utility rules, users can install it themselves and don’t have to jump through all the permitting and contractual hoops or pay electricians in order to get it up and running like homeowners who install rooftop solar do

            https://cechouston.org/2025/10/21/balcony-solar-something-new-under-the-sun/

            E: downboats for facts, I guess

            • acosmichippo@lemmy.world
              link
              fedilink
              English
              arrow-up
              1
              ·
              17 days ago

              downvotes because your facts are misinterpreted. This entire discussion is about exporting to the grid. All this legislation does is allow you to use balcony solar for yourself; NOT connecting it to the grid. If you want to export to the grid (like to participate in net metering) you still need PTO.

              • artyom@piefed.social
                link
                fedilink
                English
                arrow-up
                1
                ·
                17 days ago

                You’re literally the only person talking about exporting to the grid. This discussion is about preventing exporting to the grid.

Technology@lemmy.world

technology@lemmy.world

Subscribe from Remote Instance

Create a post
You are not logged in. However you can subscribe from another Fediverse account, for example Lemmy or Mastodon. To do this, paste the following into the search field of your instance: !technology@lemmy.world

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related news or articles.
  3. Be excellent to each other!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
  9. Check for duplicates before posting, duplicates may be removed
  10. Accounts 7 days and younger will have their posts automatically removed.

Approved Bots


  • @L4s@lemmy.world
  • @autotldr@lemmings.world
  • @PipedLinkBot@feddit.rocks
  • @wikibot@lemmy.world
Visibility: Public
globe

This community can be federated to other instances and be posted/commented in by their users.

  • 2.57K users / day
  • 8.38K users / week
  • 15K users / month
  • 28.1K users / 6 months
  • 731 local subscribers
  • 83.2K subscribers
  • 18.2K Posts
  • 663K Comments
  • Modlog
  • mods:
  • L3s@lemmy.world
  • enu@lemmy.world
  • Technopagan@lemmy.world
  • L4sBot@lemmy.world
  • L3s@hackingne.ws
  • BE: 0.19.16
  • Modlog
  • Legal
  • Instances
  • Docs
  • Code
  • join-lemmy.org