

The point is not that crunchy simulation is undesirable, but that every simulation model is an exercise in where to draw the line in what accuracy you’re losing to keep your goals achievable. OP has expressed the crunch is too much for them. “It’s okay to draw the line further away from accuracy” was the core message I was trying to convey.
















I mean the way it got truncated makes it clickbaity.