• eestileib
    link
    fedilink
    arrow-up
    9
    ·
    27 days ago

    The datacenter industry has planned build outs that will require them using 13-15% of the power in America even after they add their own filthy new generation.

    That’s insane.

    • FoundFootFootage78@lemmy.ml
      link
      fedilink
      English
      arrow-up
      2
      ·
      27 days ago

      The American power grid is so screwed.

      I’m still in total despair over Trump killing that offshore wind farm that was near completion. It’s like he’s going out of his way to crush our hope for the future.

      • Concetta
        link
        fedilink
        arrow-up
        2
        ·
        26 days ago

        I thought you had just said concerns are overblown?

          • Concetta
            link
            fedilink
            arrow-up
            2
            ·
            26 days ago

            You’ll have to explain how chatbots ran by the same company are fundamentally different. Because imo you’re completely wrong.